SPRING CREEK CULVERT REPLACEMENT AND DEMOLITION

Spring Creek Bridge provides two lanes of travel along the Kamilaroi Highway between Narrabri and Wee Waa. TfNSW proposed to replace the existing bridge sized culvert and replace with a new bridge on the existing alignment.
MLEI provided the following services:
- Desktop investigation
- Temporary works advice
- Demolition options
- Bridge design
- Finite element modelling
- IV detail design
- Monitoring.